OPTICALBay of Bengal cloud cover > 85% during pre-monsoon window (May 15–20)71·TELEMETRYANANTSAT-2 maintains perigee ≥ 380 km through Q3 202683·THERMALThar Desert LST exceeds 52 °C during May heat window64·OPTICALChambal basin NDVI drops below 0.35 before Kharif sowing (Jun 15)48·THERMALArabian Sea SST > 28 °C across > 30% of area before Jun 155·OPTICALGangetic Plain AOD > 1.0 during post-Diwali week 202688·THERMALMumbai UHI intensity > 4.5 °C over eastern suburbs in May58·SARSAR CCD flags > 3 new construction sites in Jaisalmer district in Q239·TELEMETRYANANTSAT-2 UHF downlink maintains ≥ 8 kbps through eclipse season (Jun–Jul)69·MISSIONANANT-2 achieves full solar panel deployment within 48 h of ejection77·MISSIONANANT-2 ADCS achieves ≤ 0.5° pointing accuracy within 30 days of commissioning72·OPTICALRann of Kutch SWIR reflectance drops below 0.55 before monsoon inundation43·OPTICALBay of Bengal cloud cover > 85% during pre-monsoon window (May 15–20)71·TELEMETRYANANTSAT-2 maintains perigee ≥ 380 km through Q3 202683·THERMALThar Desert LST exceeds 52 °C during May heat window64·OPTICALChambal basin NDVI drops below 0.35 before Kharif sowing (Jun 15)48·THERMALArabian Sea SST > 28 °C across > 30% of area before Jun 155·OPTICALGangetic Plain AOD > 1.0 during post-Diwali week 202688·THERMALMumbai UHI intensity > 4.5 °C over eastern suburbs in May58·SARSAR CCD flags > 3 new construction sites in Jaisalmer district in Q239·TELEMETRYANANTSAT-2 UHF downlink maintains ≥ 8 kbps through eclipse season (Jun–Jul)69·MISSIONANANT-2 achieves full solar panel deployment within 48 h of ejection77·MISSIONANANT-2 ADCS achieves ≤ 0.5° pointing accuracy within 30 days of commissioning72·OPTICALRann of Kutch SWIR reflectance drops below 0.55 before monsoon inundation43·
WHY OUR DATA IS DIFFERENT

Every thesis here resolves against data produced by satellites Team Anant designed and built at BITS Pilani — not news, not APIs, not third-party sources. We publish the resolution methodology before each thesis opens and apply it algorithmically. The satellite is the ground truth.

DATA SOURCES
OPTICALVisible / NIR / SWIR imagery from ANANTSAT-2 — cloud fraction, NDVI, reflectance, AOD.
SARC-band synthetic aperture radar coherence — change detection, infrastructure monitoring.
THERMALLWIR land surface & sea surface temperature — heat waves, UHI, ocean SST.
TELEMETRYOnboard housekeeping & RF link data — orbital mechanics, downlink performance.
MISSIONSpacecraft mission milestones — deployment, subsystem qualification, commissioning.
HOW TO TRADE
01 · Get AP

10,000 Anant Points on signup. No real money. AP is the unit of account on this platform.

02 · Read the data

Each market card shows live satellite feed context. Use it before taking a position.

03 · LONG or SHORT

LONG = you believe the hypothesis resolves true. SHORT = false. Price is the implied probability.

04 · Collect

Correct positions pay 100¢ per share at resolution. The edge is understanding satellite data better than the market.

TEAM ANANT · BITS PILANI · MISSION HERITAGE

Three satellites. One team.

Team Anant is a student satellite research and engineering team at BITS Pilani. We design, build, and operate nanosatellites entirely in-house — from PCB fabrication to on-orbit operations. Every thesis on this platform uses data we collected ourselves.

MISSION 01COMPLETED
ANANTSAT-1
1U CUBESAT · RELAY COMMUNICATIONS

Team Anant's first orbital mission. A 1U CubeSat demonstrating store-and-forward RF relay communications over Indian ground stations. Successfully completed all mission objectives and validated the team's end-to-end satellite development pipeline — from design to on-orbit operations.

1U FORM FACTORUHF/VHF RELAYSTORE & FORWARDMISSION COMPLETE
MISSION 02IN ORBITORBIT 2,846
ANANTSAT-2
3U CUBESAT · HYPERSPECTRAL IMAGING

Team Anant's second and current mission. A 3U hyperspectral imaging satellite operating at 412 km altitude, 51.64° inclination. Equipped with optical (visible, NIR, SWIR), thermal (LWIR), and SAR-compatible payload. The primary data source for all active theses on this platform.

PERIGEE
412.4 km
INCLINATION
51.64°
PERIOD
92.8 min
EPS
NOMINAL
OPTICALTHERMALSARTELEMETRY
MISSION 03INTEGRATION · LAUNCH NOV 2026
ANANTSAT-3
3U CUBESAT · NEXT GENERATION

Currently in integration at BITS Pilani. Planned launch November 2026. Expanded imaging coverage, improved pointing accuracy (ADCS ≤ 0.5° target), and additional payload capacity. Solar panel deployment and ADCS qualification markets are already open.

IN INTEGRATIONLAUNCH NOV 20263U FORM FACTOR
Anant
Team Anant · BITS Pilani, Rajasthan
Student satellite research and engineering team. Building and operating nanosatellites end-to-end since our first mission.
markets.team-anant.com ↗